LOD, Level Of Development, means the level of development of a BIM model with respect to the detailing and embedded information. It corresponds to the design stage of the project, from schematic design to "as built".
There are a total of 5 LOD levels: 100, 200, 300, 400 and 500.
![](https://static.wixstatic.com/media/e57c80_e8f9ea2c3f904063ab5d652e1b4ebff3~mv2.jpg/v1/fill/w_980,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/e57c80_e8f9ea2c3f904063ab5d652e1b4ebff3~mv2.jpg)
Kommentare